Article26 Nov 20265 min read

The MDR Runway Report 2027: what CE marking really costs in time and cash

Most notified bodies quote 13 to 24 months for an MDR certificate. Our free report shows the cash a CE mark needs, and when to raise it.

Document

Read the full report

Leave your email to open the PDF.

On the day a medical device company signs its written agreement with a notified body, two clocks start. The first belongs to the notified body and runs to the certificate, and it is the one every plan watches, the one the regulators now count in days. The second belongs to the company. It runs on cash, through the months of rework and the months after the certificate when no hospital has yet paid, and it stops only when the first customer pays.

Most plans watch only the first clock, and the first clock alone is long. In the Commission's survey of March 2026, 82% of the notified bodies that had issued a quality-system and product certificate put the time from contract to certificate at 13 to 24 months. Manufacturers, who count their own files, report longer: a third of those holding such a certificate waited more than 24 months. And before the contract there is the file, which most companies need six months or more to write.

Why the second clock runs out first

Much of that time belongs to the company. In 2025, 65% of MDR technical files reached the notified bodies less than half complete, and on either side's estimate eight to ten months of an 18-month certificate are spent by the company's own people, rewriting the company's own documents. Every one of those months is paid for.

The certificate itself is the smaller bill. Manufacturers put the median direct cost of a product certificate at €100,000, yet in MedTech Europe's 2024 survey nine-tenths of the first year's spending on certification went on people. The people are the burn. A company with a net burn of €300,000 a month spends three times the median cost of a product certificate in every month it waits.

And the certificate does not end the wait. A German hospital that wants a separate payment for a new method must file its request with InEK by 31 October, or wait for the next year's round; Sweden's regions buy through tenders that open on their own calendar; in Portugal the national health service was paying device companies after 222 days on average in August 2025.

What changes in 2027, and what does not

From 25 February 2027, Implementing Regulation (EU) 2026/977 gives notified bodies maximum timelines for new contracts: at most 140 days of their own time from the agreed start to the certificate. It is a real change, and a smaller one than it looks, because the clock stops while the company answers, and the law sets no limit on how long those answers take.

The deadlines do not wait either. On 31 December 2027 the extended transition ends for class III and implantable class IIb legacy devices, and a year later for most others, while the bodies themselves are shrinking: in 2025 Team-NB's members cut their assessment staff by 8% and their subcontractors by 21%. In July 2026 Sweden lost one of its two MDR notified bodies to bankruptcy.

What the report found

The MDR Runway Report 2027, which CW1 Group publishes on 26 November 2026, reads the European Commission's surveys of all 52 MDR notified bodies and of manufacturers, the Team-NB and MedTech Europe surveys, the law, and national sources in Germany, Sweden, Portugal and the United States. Beyond the figures above, it finds:

Area

Finding

Source

The queue

55 MDR certificates for every 100 applications by February 2026, against 43 a year before (32,898 applications and 18,010 certificates since designation)

Commission notified-body survey

Refusals

989 MDR applications refused by February 2026; about 30% of refusal reasons were applications outside the body's designation, about 25% incomplete files

Commission notified-body survey

The certificate

Median direct cost of €50,000 for a quality-system certificate and €100,000 for a product certificate, against averages of €88,867 and €194,785

Manufacturers' survey

The clinical evaluation

A median of €20,000 for a class IIa device and €50,000 for class III, before any clinical investigation

Manufacturers' survey

Keeping it

A median of €30,000 a year to maintain each certificate

Manufacturers' survey

Germany

For 2026, hospitals filed 148,488 NUB requests covering 1,084 methods; 326 methods, 30.1%, met the criteria

InEK, NUB 2026

United States

The FDA took about 141 days on average to decide a 510(k) in the fiscal 2025 cohort; 92% of notified bodies quote 6 to 18 months for a quality-system certificate

FDA, MDUFA reports

Outside the EU

49.53% of the micro and small manufacturers among Team-NB members' clients were based outside the EU

Team-NB survey 2025

How much cash does a CE mark need?

The report's answer starts with a rule every finance director knows: time first, money second. The cash a CE mark needs is the months to the certificate plus the months to first revenue, multiplied by the monthly burn, plus the cost of certification itself.

Run through that rule, three hypothetical companies, a software company in Stockholm, a device maker in Munich and an American company with FDA clearance entering Germany, need 29.6 to 36.6 months of cash in the base case and 41.6 to 54.6 months in the slow case, buffer included: €3.0 to €3.7 million, or €4.2 to €5.5 million, for every €100,000 of monthly burn. In two of the three, a late first sale costs more than a slow notified-body phase. For contracts signed from 25 February 2027, the model puts the notified-body phase at 14.6 months in the base case, against 18 before.

Some of those months can be won before the contract is signed. A check in NANDO, the Commission's database of notified bodies, that the body's designation covers the device avoids the most common reason for refusal. A start date and the rules for each stop of the clock, written into the agreement, turn the body's estimate into terms of the contract. And a hospital partner for the NUB request, a region's tender calendar or the Portuguese payment terms belong in the plan before the certificate arrives.

The report gives the rest: the model and its assumptions, the three companies line by line, the calendars of Germany, Sweden and Portugal, the FDA clock beside the CE clock, and seven steps to take before signing.

Who it is for

The report is written for the people who answer for a CE mark with their budget: the chief executive and the finance director of a medical device or IVD company with 10 to 200 staff, its head of regulatory affairs and quality, the director who will sell the device in Europe, and the investors and board members who fund the stage between the first draft of a technical file and the first invoice. It also speaks to US companies with FDA clearance that plan European revenue within 12 to 24 months.

Download the report

The MDR Runway Report 2027 is free to download from 26 November 2026. Leave your email address, and count your runway before the notified body starts counting its days.

CW1 Group is a team of strategy and finance consultants who work with physicians, with companies in Sweden, Germany and Portugal.

More insights

We use cookies to give you the best possible experience, and while some are essential, others help us understand how you use the site, so we can improve it. Click “Accept all cookies” to proceed as specified, “Decline optional cookies” to accept only essential cookies, or click “Manage my preferences” to choose what cookie types you will accept. Cookie Policy.

© CW1 Inc, All rights reserved
CW1 Group